Lötschberg and Gott­hard base tunnel
Standort

Lötschberg and Gotthard base tunnel

Mechanical equipment / ventilation of the railway tunnels:

  • Lötschberg: Building ventilation, crane systems, false floor, signage, doors / gates, railway tunnel gates, metal construction (railings), ventilation openings
  • Gotthard: Ventilation equipment for the transversal galleries (planning, delivery, installation, assembly and maintenance du ring the equipment phase)

railway technology

electrical engineering

Client

Lötschberg: BLS AlpTransit AG
Gotthard: AlpTransit Gotthard AG


Main contractor

Lötschberg: ABL ARGE Bahntechnik
Gotthard: AlpTransit Gotthard AG


Built

Lötschberg: 2002 – 2007
Gotthard: 2008 – 2016

Impressions

Further references

Data protection notice

This website uses third-party web analysis tools to analyze the use of the website and measure the success of advertising campaigns, as well as external components such as Google Maps. Cookies are stored for this purpose. The necessary cookies do not lead to any data transmission and cannot be deselected.
Permission to use analysis/marketing cookies and external components may involve the transfer of data to the USA.

You can revoke or adjust your selection at any time under data protection information.